top of page

Due Diligence Reviews

  • Writer: Ryan Joki
    Ryan Joki
  • Jun 13
  • 1 min read

Updated: Jul 23

Is your project between milestone phases? That is the perfect time to review and optimize the current design, so as to capture capital and operating opportunities and implement those benefits in the next phase of design.

Because MinPoint has been involved, in some capacity, in the mechanical layout/ design development of over 30 projects, we have seen a number of solutions to the most common unit operation challenges.

Many of these projects are operational, and we have vetted feedback on the benefits/ drawbacks of given solutions.

With this database we are well positioned to identify opportunities or risks in your current design.

ree

A small investment of time in engineering phases to optimize a design can save exponential amounts of time and money in subsequent engineering phases, in construction, and operations/ maintenance.

We would be happy to review your current plant and suggest optimizations; whether it exists in a design environment only, or has been operating for decades.

 
 
bottom of page