Aeris Resources- Stockman Project

Project Phases

Feasibility Study

Date

2022-2025

Client

Aeris Resources/Optimize Group

Location

Australia

Role

Lead Layout Designer

Mining operations will utilise conventional long hole stoping and backfill methods, with ore trucked to surface. Ore will undergo crushing and grinding before being treated using sequential flotation in a 1.0Mtpa processing plant to produce copper and zinc concentrates containing silver and gold by-products. The concentrates will be loaded into containers for transport via road to port for shipping to smelters. (https://www.aerisresources.com.au/assets/stockman-project/)