Tocantinzinho Gold Project

Project Phases

Feasibility Study & Detailed Engineering

Date

2021-2024

Client

GMining Ventures/ GMining Services

Location

Brazil

4.3 Mtpa gold plant. Primary jaw crusher, conventional SAB circuit, including gravity gold, Carbon-In-Leach, on site ADR, and gold room.

- In Feasibility Study, responsible for 3D model production, 2D GA extractions, conceptual design of all platework, distribution boxes, launders, tankage (including tank internals and ancillaries such as
baffles, agitator bridges, overflow box design, etc.), chutework, live volume and containment
calculations/ modelling.
- Involved in TBE’s to select offerings that align with FS design and allow for expedient engineering in Detailed phase.
- In Detailed Engineering involved in design of CIL, thickening and water services including platework for shop-fab and field erected tanks.