Cerro Blanco Open Pit

Project Phases

PEA/FS

Date

2021-2023

Client

Bluestone Resources

Location

Guatemala

Role

Lead Layout Designer

High grade gold deposit processed through conventional SAB circuit, followed by Leach, CIP, ADR and refinery. Feasibility study optimization included relocating the FS plant to an area, within the permitted site, that was less impacted by potential seismic activity. It subsequently involved transitioning from an underground project to an open pit project- increasing production by 100%, considering a lower average grade, to capitalize on the economics of scale.

- Lead Layout Designer co-ordinating production of 2D and 3D deliverables.
- 3D Layout model used as a basis for steel, concrete, piping and platework MTO’s.
- Aid in preparation of datasheets and sketches for RFQ’s, and participated in TBE’s.