Cerro Blanco Open Pit
Project Phases
PEA/FS
Date
2021-2023
Client
Bluestone Resources
Location
Guatemala
Role
Lead Layout Designer
High grade gold deposit processed through conventional SAB circuit, followed by Leach, CIP, ADR and refinery. Feasibility study optimization included relocating the FS plant to an area, within the permitted site, that was less impacted by potential seismic activity. It subsequently involved transitioning from an underground project to an open pit project- increasing production by 100%, considering a lower average grade, to capitalize on the economics of scale.
- Lead Layout Designer co-ordinating production of 2D and 3D deliverables.
- 3D Layout model used as a basis for steel, concrete, piping and platework MTO’s.
- Aid in preparation of datasheets and sketches for RFQ’s, and participated in TBE’s.